Changes to the system should be properly managed so that the The system should behave in such a way as to safeguard the credibility of the organisation. of every change is evaluated and the changes are approved in advance of being implemented.
|
|
| namespace | SABSA |
| stereotype | StrategicAttribute |
| softMetric | Independent audit or focus groups or satisfaction survey. |